Saturday, June 8, 2024

RECHARGE PIT is mandatory in Canals, Drains

  •  13,873 km; Road under BBMP
  •  860 km; Rainwater is a huge channel
  •  5,500 km; Road under BDA

 No need for concrete for drain bottom: Notice to BBMP, BDA again

 RECHARGE PIT is mandatory in canals

Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್

Bengaluru: BBMP and BDA have been warned once again that concrete should not be placed at the bottom of the road side drains and rain water RECHARGE PIT should be made at storm water drains and road side drains.

 Development Commissioner Shalini Rajneesh has indicated that the areas of Bruhat Bengaluru Mahanagara palike (BBMP) and Bebgaluru Development Authority (BDA) are under the scope of the Suvarnamukhi River Basin Reclamation Project, and these departments should arrange rainwater RECHARGE PIT in the areas under their jurisdiction.

 Most of the rain water in South Taluk of the city flows into Suvarnamukhi River. The area of BBMP and BDA is increased in this area, and 'RECHARGE PIT' should be constructed to channel the rain water falling in the city into drains. Henceforth, while constructing new drains, it has been advised that concrete should not be placed at the bottom.

 Rainwater flows into water bodies from drains and large canals. Thus, it should be ensured that plastic, sewage water and solid waste materials do not enter the drains. All kinds of constructions obstructing water bodies should be cleared and people should be made more aware about rain water harvesting. It has been suggested that the Chief Engineer of Rajkaluwe Division (SWD) of BBMP should ensure that solid waste does not enter the water bodies.

Establishment of STP: 

It is necessary to control sewage water area wise within Bangalore Water Board. Bwssb should ensure that everyone has sewerage connection in inhabited areas. Sewage water should be treated before it is discharged into the open canal. For that, the BWSSB has been ordered to construct waste water treatment plants (STP) wherever required.

 BBMP, BDA and Bwssb should implement all these works within the available funds without expecting any kind of additional funds. It was ordered on May 17 that the action plan should be prepared within a month and the implementation work should begin.

 NGT order is not being followed!

 Concrete should not be placed at the bottom of canals and drains through which rainwater flows. The National Green Tribunal (NGT) has ordered that concrete drains should not be constructed in box type or U shape. However, none of the departments in the city, including BBMP, BDA, are following this order. If two side walls are constructed, the work requires more care. It is easy to construct drains in box or U shape with concrete. Therefore, even the senior engineers have not taken into account the NGT order, said BDA and BBMP engineers.

More than a crore RECHARGE PIT (Ingugundi) is possible!

 RECHARGE PIT has been constructed in road drains in Yediyur ward. Due to this, the amount of rain water flow is reduced and ground water is also increased. Similarly, crores of RECHARGE PIT can be built all over the city. However, such work has not been done everywhere. The work is done according to the will of the local people's representatives. The engineers informed that no one will do the inspection.

 There are more than 13,000 km of road in the BBMP area, which is 26,000 km including both sides. Even if at least 5 RECHARGE PIT are constructed per km, there will be more than 1 crore RECHARGE PIT. Millions of liters of water can be sent to the earth in every rain. If water wells are constructed in BDA, BMRDA and urban districts, groundwater will be enriched.



Wednesday, June 5, 2024

Conocarpus: 'Dubai plant' dangerous to health

 Thousands of plants are also planted in nurseries of Forest Department, BBMP, BDA on roads

 'Dubai plant' dangerous to health




Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್ 

 Bengaluru: Conocarpus plant, which spoils the rain environment, adversely affects the health of citizens, is banned in the UAE and two states of the country, is spreading in the city.

 Conocarpus plant has been banned in Gujarat and Telangana states in 2023 as it is harmful to human health and will cause a situation where the rains do not come down in the area where these plants grow. In Gujarat these plants and trees have been cleared uprooted and burnt.

 The harmful Conocarpus plant also known as 'Dubai plant' has been planted and is being planted by Forest Department, BBMP, BDA in most areas of the city. BBMP and BDA are growing hundreds of conocarpus plants in the middle of the city's main main road, outer ring roads and central part roads. BBMP has also planted conocarpus in its gardens.

 Thousands of saplings are also being cultivated in the nurseries of BDA, BBMP and Forest Department. Conocarpus is fast growing and does not require much care. Rather quickly the green spreads and takes root. Due to this, government departments are planting more of this plant. In order to show more greenery, citizens, authorities are nurturing plants that are harmful to the environment.

There was not much information about the adverse effects of Conocarpus plant. Planted to grow fast. There are also plants in nurseries. Recently, experts have brought to our attention that it absorbs ground water more and affects breathing. Its seeds are large, from which plants arise. We now know that this is fatal. We have brought to the attention of senior officials about banning these plants. BBMP and BDA officials said that the higher officials of the forest department should take action.

 Associations and citizens should not plant large number of deadly Conocarpus plants in the nursery of BBMP and Forest Departments on the occasion of Environment Day. Experts have requested that only local plants should be given priority.

Harmful to Health...

 Conocarpus plant – The tree is high in carbon and emits a deadly acid that has a harmful effect on the human body, causing respiratory problems. Allergic diseases including cold, cough, asthma arise. Harmful to the health of native insects, birds and animals. In winter, this plant-tree is more affected. Excessive rooting can also damage underground cables and pipelines. 

 'should be Clear...'

 Conocarpus, which is prohibited elsewhere as it affects health and is naturally deadly to insects and birds, should not be cultivated. Plant expert N.M. should also take action to clear the trees and plants that are being planted and grown. Ganesh Babu demanded.

'We have brought to our attention...'

 We have brought to the attention of the forest department officials about the planting of conocarpus trees in BBMP. The dangers caused by these plants were explained to them and they were requested to take action to ban them. Planted plants should be removed. Before that, care should be taken not to plant these trees,' said 'Tree Doctor' Vijay Nishant.

 'We will take action...'

 Experts have brought to our home attention about the ill effects of Conocarpus plants. The plant is grown in the middle of the roads as it is more green. We will bring it to the attention of senior officials and discuss it and take action," said BBMP Forest Department officers.



Monday, January 8, 2024

KSPCB: Expenditure is more than three times the income

 Approval of State Pollution Control Board Action Plan

 Expenditure is more than three times the income

Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್

 BENGALURU: The board meeting has approved an action plan for three times the expected revenue of the State Pollution Control Board.

 In the 243rd Board meeting, an action plan of ₹1,546.44 crore was approved despite the expected revenue of only ₹600 crore in the next three years. It is alleged that this is a plan to immediately spend the remaining ₹1,050 crore in the financial year 2023, which will bankrupt the board.

 A board member, who did not want to be named, complained that 'Such a decision has been taken to spend one thousand crores as per their wish'.

 The board meeting agreed to spend money for awareness and awareness programs including development of laboratories, water quality management system, software upgradation for 2023-24, 2024-25, 2025-26.

 The board members objected to the opinion of Chairman Shanth Thimmaiah that it is not right for the member secretary to send the agenda of the meetings to the members without the approval of the Chairman and said that the agenda can be sent to the members by the member secretary. Also, the members unanimously decided to keep the video-audio recording of the board meeting aside and put aside the chairman's words.

 The meeting approved the filling of 220 posts of the board and it was decided to request the government to fill up the rest of the posts except driver and watchman posts through the Karnataka Examinations Authority.

The State Level Enforcement Committee has been reconstituted and the members nominated by the Government have also been appointed. As per the KTPP Act, it has been decided to increase the amount of expenditure on projects approved by the Chairman and Member Secretary. It has been decided to amend the rules to increase the power of the Chairman from ₹50 lakh to ₹5 crore and that of the Member Secretary from ₹25 lakh to ₹2 crore.

 BBMP's ₹53 crore extravagance!

 The State Pollution Control Board has decided to spend ₹53 crore given by the BBMP to replace the action plan of 64 activities of the 'Vayu Yojana' selected on the Central Air Pollution Control Board's 'Prana' portal.

 The money allocated to BBMP in the 15th financial plan is being spent for monitoring air pollution, road dust study, upgrading of laboratories, vehicle air pollution monitoring, survey, study and report preparation. The board members complained that this will not be of any use.

 Project cost details

  •  finance; ₹747.66
  •  Chief Environment Officer–3; ₹233.17
  •  Waste Management Cell–1; ₹208.31
  •  administration; ₹123.71
  •  building; ₹115
  •  Groundwater Quality Study; ₹29.05
  •  IT; ₹24.50
  •  Branch of Mines and Geology; ₹18.45
  •  Awareness and training; ₹15
  •  Lake development; ₹13.35
  •  17th category and e-electronic cell; ₹7.26 crore
  •  Waste Management Cell–2; ₹7.15
  •  Legal Branch; ₹3.83
  •  Action Plan Total Amount; ₹1,546.44
  •  From prospective sources of income; ₹600
  •  Amount remaining in board till April 2023; ₹1,050

ಕನ್ನಡದಲ್ಲಿ ಓದಲು ಇಲ್ಲಿ ಕ್ಲಿಕ್ ಮಾಡಿ...




Saturday, January 6, 2024

Suspension of Environment Officers

 Illegal establishment, operation consent letter for plastic processing plant

 Suspension of Environment Officers

 Bengaluru: Two environmental officers of the State Pollution Control Board have been suspended for illegally granting permission to set up and operate a plastic processing unit.

 S.K., who was a senior environmental officer in the Bengaluru South Zone and Ramanagara Zone Offices of the State Pollution Control Board.  Vasudev and C.R. who is an environmental officer in Ramanagara regional office.  Manjunath was suspended and the chairman of the board, Shant A.  Thimmaiah ordered.

 Certificates have been illegally issued to the plastic waste processing unit of Enviro Recyclene at Harohalli in Ramanagara.  On October 26, 2023, the Chairman of the Central Pollution Control Board directed the Chairman of the State Pollution Control Board that action should be taken against the concerned officer.

 The Member Secretary had instructed the Chief Environment Officer-3 to give a report on this.  The report was given on November 10, 2023.

 'S.K.  Vasudev, C.R.  Manjunath is directly responsible for the illegal case.  It is obvious that his dereliction of duty has come to light, he has acted in a manner unbecoming of board employees and has shown neglect of duty.  Hence it is deemed appropriate to take disciplinary action against you.  Being suspended as there is a possibility of destruction of evidence and documents if you continue on duty.  Your central location has been changed to Bangalore.  The board chairman explained in the order issued on January 3 that a departmental inquiry will be conducted.

ಕನ್ನಡದಲ್ಲಿ ಓದಲು ಇಲ್ಲಿ ಕ್ಲಿಕ್ ಮಾಡಿ ...



Friday, January 5, 2024

Treated water for lakes in 38 villages

 19 Measures to prevent sewage water from flowing into water bodies: Project by Jalamandali with World Bank assistance

Treated water for lakes in 38 villages

Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್

Bengaluru: Bengaluru Jalamandali (BWSSB) has devised a World Bank-assisted project to stop the flow of sewage water into 19 lakes under the BBMP.

 A plan to set up Sewage Water Treatment Plants (SPT) has been submitted to the World Bank and its approval is in the final stage. The Jalamandali has planned to complete the installation of STP in one year after getting the approval.

 As per the instructions of the National Green Tribunal, water supply and sewerage lines will be installed in 110 villages on the 'trunked pipeline' model. So that the sewage water does not flow outside. Millions of liters of sewage water from 38 villages and about 30 new layouts under their jurisdiction are directly entering the lakes every day. To prevent this, 9 STPs are installed to drain the treated water into the lake. From this, a plan has been made to drain only treated water in the lakes of this part and the series of canals after it.

 Along with these STPs 10 Intermediate Sewage Pumping Stations (ISPS) are also being set up. The total cost of the project including setting up of ISPS units near lakes where STPs cannot be set up and pumping sewage water to STPs is estimated to be around ₹1 thousand crore.

 A plan has been made to install STP and ISPS to prevent sewage water from flowing into 19 lakes. World Bank assistance has been sought for this and administrative approval has been obtained. As soon as the financial approval is received, the tender process will be completed and the units will be installed, said Jalamandali Chairman Ram Prasat Manohar.

Now a plan has been prepared to treat the sewage water of 38 villages. Similar units will be set up in 110 villages in the coming days. Financial assistance and grants are being checked for this,' he said.

 Action to stop sewage flows to all lakes: Ram Prasat

 "Sewage water flowing into lakes in the city is a perennial problem. This is being gradually reduced and steps will be taken to ensure that sewage water does not flow directly into any lake in the next few years. Only treated water is thought to flow into the lake. Ram Prasat Manohar, president of Bengaluru Jalamandali said that many projects have been prepared for this purpose and the water board will try to save the environment of the lakes.

  •  9 Sewage Water Treatment Plant
  •  148 mld Total capacity of nine STPs
  •  10 IS Pumping Station
  •  21 mld Total pumping capacity of ten ISPS

 STP for sewage water of which villages?

 Kammanahalli, Kalena Agrahara, Basapur; Chikkatogur, Dodtogur, Bharatena Agrahara, Naganathpur, Parappana Agrahara; Kudlu, Haralur, Kasavanahalli, Kaikondanahalli, Junnasandra, Doddakallahalli; Dodka Kallasandra; Mallasandra, Judicial Layout; Hagadur, Vijayanagar, Gandhipura, Channasandra, Nagondanahalli; Kattigenahalli, Srinivaspur; Yallahalli, Chandrashekarpura, Gottigere, Pillaganahalli; Varthur, Gunjur, Sorhunse, Balagere.

 Sewage water does not flow to which lakes!

 Begur, Rayasandra, Saul Kere, Doddakallasandra, Jogikere, Channasandra, Kottigenahalli, Kogilu, Palanahalli, Jakkuru, Hulimavu, Varthur, Gottigere, Ambalipur, Chikkabellandur, Talaghattapur, Kammanahalli, Harohalli, Yalahanka Kere.

ಕನ್ನಡದಲ್ಲಿ ಓದಲು ಇಲ್ಲಿ ಕ್ಲಿಕ್ ಮಾಡಿ...



Thursday, January 4, 2024

Additional 10 TMC CAUVERY WATER to BENGALURU

 Reduction of excess water use in agriculture; Notice to water board to increase capacity

 Additional 10 TMC CAUVERY WATER to BENGALURU

Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್

 BENGALURU: The government has decided to supply 10 tmc ft of additional water to Bengaluru city to save Cauvery water, which is heavily used in agriculture.

 The new settlements and areas of the city, including the 110 villages covered by the Brihat Bengaluru Mahanagara Palika (BBMP), need more water. Thus, the Bengaluru Water Supply and Sewerage Board (BWSSB) had submitted a proposal to the government that surplus water should be allocated. After reviewing this, the government directed the Cauvery Irrigation Corporation to review the feasibility of supplying additional water and submit a report.

 A committee led by technical experts conducted a review and found that 'rice, sugarcane and other agricultural crops are using much more water than required. If this is reduced, more water can be provided to Bangalore', the report said. Based on this report, the government has given in-principle consent to the BWSSB and suggested to increase the capacity to use the surplus water.

 Cauvery 5th phase project to supply water to Bengaluru is in the final stage and it is planned to supply water to 110 villages in April. On this occasion, it is intended to start the works to increase the capacity to collect and supply additional 10 TMC feet of water,'' BWSSB President Ramprasath Manohar informed.

 BWSSB uses 24 TMC feet of water from Cauvery annually, of which 20% is classified as 'Consumptive use'. That is, if using the water obtained from the river, 20% of it is returned to the river itself, there is a chance of getting that amount of water in excess. On this basis, the government has agreed to demand more water. Officials explained that most of the water used in the city is joining Kaveri River through Vrishabhavati, Arkavati and canal-valleys.

Consent in principle: Ramprasat

 A proposal was submitted to the government that due to the increase in the population of the city and the development of the areas, the allocation of water should be increased. BWSSB Chairman Ramprasath Manohar said that an in-principle consent has been given to save 10 TMC feet of water under the Cauvery Irrigation Corporation.

 Annual allocation of Cauvery water to the city

  •  24 TMC Ft: Allotment as per Supreme Court judgment
  •  19 TMC Ft: Water currently being used
  •  5 TMC Ft: Water available for stage 5
  •  34 TMC Ft: The total water allocation is 10 tmcft which the government has now agreed to

 Use of Cauvery water in the city

  •  1,450 million litres: Daily supply of water in the city
  •  1.6 TMC Ft: Water being supplied to the city every month
  •  750 million litres: Additional water supplied daily on completion of 5th stage
  •  2.4 TMC Ft: Current and Phase 5 water supply to the city every month

ಕನ್ನಡದಲ್ಲಿ ಓದಲು ಇಲ್ಲಿ ಕ್ಲಿಕ್ ಮಾಡಿ...



Wednesday, January 3, 2024

BBMP: Budget preparation begins

 Rethinking zone-wise budget; Citizens' advice is not invited

 BBMP: Budget preparation begins


Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್

Bengaluru: BBMP has started preparing the budget for 2024-25, department-wise progress and consultation meetings are going on.

 Chief Commissioner Tushar Girinath has already held a meeting with the Commissioners of Zones including Special Commissioners of all Divisions. He instructed to provide information on budget preparation and status of expenditure and projects in this financial year.

 Officials said that the heads of all departments and executive engineers of BBMP have started the work of budget preparation and providing information and will give details within January 15.

 Chief Commissioner Tushar Girinath had said last year that 'zone-wise budget presentation will be provided'. But as it was the occasion of assembly elections without any opportunity for that, the budget was presented as usual. But this time the thinking has started again for the zone wise budget.

 As Commissioners are appointed only for zones, they are responsible for the works there. It is intended to get information about works and projects from them and provide finance for them. Already, bills are being paid to the contractors by zone wise Chief Engineers. Thus, it is known that the budget has been planned to be presented sector wise.

 Officials informed that the budget of the departments that manage major and major projects like urban planning, Storm water drain, projects, solid waste, lakes, and road infrastructure will be separate.

Last time suggestions were invited from the public in December itself. This time no such process took place. The officials are not giving recognition to the few exists ward committee's opinions. Therefore, this time also the important officials and Deputy Chief Minister D.K.Shivakumar's words and thoughts only will be in the budget, said a senior engineer, who did not want to reveal his name.

 As it has been decided to strictly collect all types of fees and taxes to be paid to the corporation including property tax, the income will increase. Therefore, it is said that this time the budget will also include a proposal to carry out huge projects including white topping and flyover under the corporation's grant.

 The budget for the year 2022-23 was presented on the website last year on March 31 at 11.30 pm as a 'secret' budget. The then Special Commissioner of Finance, Jayaram Raipura, had presented the ₹11,163 crore budget (2023-24) in a program held at the Town Hall on March 2 last year.

 Attempt this time: Tushar Girinath

 Last year the zone wise budget was not possible. This time trying to budget zone wise. It is suggested to prepare for presentation of zonal budget for maintenance and ward level works projects. The BBMP budget will be presented in a week after the budget of the state government,'' said BBMP Chief Commissioner Tushar Girinath.

 ಕನ್ನಡದಲ್ಲಿ ಓದಲು ಇಲ್ಲಿ ಕ್ಲಿಕ್ ಮಾಡಿ...