Showing posts with label Rajakaluve. Show all posts
Showing posts with label Rajakaluve. Show all posts

Sunday, September 17, 2023

Rajakaluve Encroachment: Opportunity for Citizens to File Complaints

Rajakaluve Encroachment: Opportunity for Citizens to File Complaints

Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್ 

 Bengaluru: If Rajkaluve encroachment under BBMP is under the notice of the citizens, the Corporation has allowed to provide the information within 20th September.

 As instructed by the High Court, BBMP is taking action to identify the encroachment of major waterways (Rajkaluve).  Chief Engineer Prahlad, who is also the chief engineer of the large water canal department, said that nine executive engineers have been given responsibility and the public can also provide information about encroachments.

 Public participation in identifying encroachments/encroachments in primary and secondary level canals will help in identifying more encroachments.  Clearing these will allow rainwater to flow easily and prevent flood damage.  Therefore, the information can be sent to the Executive Engineers of the respective divisions by 2 PM on September 20.  It has been said that the list of functionaries has been made according to the assembly constituencies.




ಕನ್ನಡದಲ್ಲಿ ಓದಲು ಇಲ್ಲಿ ಕ್ಲಿಕ್ ಮಾಡಿ...

ರಾಜಕಾಲುವೆ ಒತ್ತುವರಿ: ದೂರು ಸಲ್ಲಿಸಲು ನಾಗರಿಕರಿಗೆ ಅವಕಾಶ

ಬೆಂಗಳೂರು: ಬಿಬಿಎಂಪಿ ವ್ಯಾಪ್ತಿಯಲ್ಲಿ ರಾಜಕಾಲುವೆ ಒತ್ತುವರಿ ನಾಗರಿಕರ ಗಮನದಲ್ಲಿದ್ದರೆ ಅದರ ಮಾಹಿತಿಯನ್ನು ಸೆ.20ರೊಳಗೆ ಒದಗಿಸಲು ಪಾಲಿಕೆ ಅವಕಾಶ ನೀಡಿದೆ.

ಹೈಕೋರ್ಟ್‌ ಸೂಚನೆಯಂತೆ ಬೃಹತ್ ನೀರುಗಾಲುವೆಗಳ (ರಾಜಕಾಲುವೆ) ಒತ್ತುವರಿಯನ್ನು ಗುರುತಿಸಲು ಬಿಬಿಎಂಪಿ ಕ್ರಮ ಕೈಗೊಳ್ಳುತ್ತಿದೆ. ಒಂಬತ್ತು ಕಾರ್ಯಪಾಲಕ ಎಂಜಿನಿಯರ್‌ಗಳಿಗೆ ಜವಾಬ್ದಾರಿ ವಹಿಸಿದ್ದು, ಸಾರ್ವಜನಿಕರೂ ಒತ್ತುವರಿಗಳ ಬಗ್ಗೆ ಮಾಹಿತಿ ನೀಡಬಹುದು ಎಂದು ಬೃಹತ್‌ ನೀರುಗಾಲುವೆ ವಿಭಾಗದ ಮುಖ್ಯ ಎಂಜಿನಿಯರ್‌ ಕೂಡ ಆಗಿರುವ ಪ್ರಧಾನ ಎಂಜಿನಿಯರ್‌ ಪ್ರಹ್ಲಾದ್‌ ಹೇಳಿದ್ದಾರೆ.

ಪ್ರಾಥಮಿಕ ಮತ್ತು ದ್ವಿತೀಯ ಹಂತಗಳ ರಾಜಕಾಲುವೆಗಳಲ್ಲಿ ಒತ್ತುವರಿಗಳನ್ನು/ಅತಿಕ್ರಮಣಗಳನ್ನು ಗುರುತಿಸಲು ಸಾರ್ವಜನಿಕರು ಕೈಜೋಡಿಸಿದಲ್ಲಿ ಹೆಚ್ಚಿನ ಒತ್ತುವರಿಗಳನ್ನು ಗುರುತಿಸುವಲ್ಲಿ ಸಹಕಾರಿಯಾಗುತ್ತದೆ. ಇವುಗಳನ್ನು ತೆರವು ಮಾಡುವುದರಿಂದ ಮಳೆನೀರು ಸರಾಗವಾಗಿ ಹರಿದು ಪ್ರವಾಹ ಹಾನಿಯನ್ನು ತಡೆಗಟ್ಟಬಹುದಾಗಿರುತ್ತದೆ. ಆದ್ದರಿಂದ, ಸೆ.20ರ ಮಧ್ಯಾಹ್ನ 2ರವರೆಗೆ ಮಾಹಿತಿಯನ್ನು ಆಯಾ ಭಾಗದ ಕಾರ್ಯಪಾಲಕ ಎಂಜಿನಿಯರ್‌ಗಳಿಗೆ ಕಳುಹಿಸಬಹುದು. ವಿಧಾನಸಭೆ ಕ್ಷೇತ್ರವಾರು ಕಾರ್ಯಪಾಲಕರ ಪಟ್ಟಿ ಮಾಡಲಾಗಿದೆ ಎಂದು ತಿಳಿಸಿದ್ದಾರೆ.



Wednesday, September 6, 2023

Punishment if the lake and Rajakaluve encroach remains!

 Tehsildar, Engineers responsible for clearing operation, conservation; Set a time limit for each process

Punishment if the lake and Rajakaluve encroach remains!

 Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್

Bengaluru: Tehsildar and Zonal Executive Engineers have been entrusted with the responsibility of encroachment clearing of lakes and Rajakaluve under the jurisdiction of BBMP. If they fail, the government has suggested disciplinary action.

 The state government, which has been objected by the High Court many times, has now entrusted the authorities with the responsibility of encroachment clearing and protection of lakes and Rajakaluve.

 Officials have been assigned to protect lakes and primary-secondary canals and clear encroachments, and the Urban Development Department has issued an order on August 28 specifying their responsibilities.

 Officials have been assigned to a total of 197 lakes, including 19 non-existent lakes under BBMP. According to the Karnataka Lake Conservation and Development Authority (KTCDA) Act, the Executive Engineer of the BBMP Lake Division is responsible for reporting the complaint to the officer of the 'Competent Authority'. After this competent officer clears the encroachment of the lake, it should be handed over to the lake department for maintenance and conservation of the lake. In the meantime, Tahsildar should be given order to survey, eviction.

 Once the encroachment is cleared, if the encroachment is not protected, it will be considered a gross dereliction of duty on the part of the lake department Executive engineer. BMTF shall provide necessary security during the encroachment eviction process. In addition, the police station officer of the respective jurisdiction should also provide assistance. It has been ordered that BBMP Chief Commissioner should take disciplinary action against any officer who fails to perform the prescribed responsibilities as 'gross dereliction of duty'.

Conservation of 850 km Rajakaluve

 In cases of Rajakaluve encroachment, the Executive Engineers of the Storm water drain Division are the 'Complaint Officer' and the Tehsildar is the 'Competent Authority'. The concerned Zonal Executive Engineer has been given the responsibility of physically clearing the Rajakaluve and it has been suggested that the Revenue Department Surveyor and Tehsildar should be present during the clearing. Complaint regarding eviction of encroachment should be registered by Tahsildar himself. If they fail, they will be disciplined. After the encroachment is cleared, the officials of the Storm Water drain should protect it and ensure that the water flows smoothly. Each level of maintenance of 850 km of primary and secondary Rajakaluve should be handled by the responsible authorities. Otherwise disciplinary action has been ordered.

 Lake: 70 days for encroachment clearance

 The encroachment process in 159 lakes in BBMP will be carried out in 10 lakes per week. The process of encroachment of 10 lakes each will start for a total of 16 weeks, the executive engineer of the lakes devision should prepare an encroachment report in the first three days, and then the zone executive engineer should submit it. They have to submit an application to the Tahsildar within three days to recognize the encroachment. The Tahsildar should conduct a survey and identify the encroachment within seven days. An order to vacate the encroachment should be issued within 10 days. As per KTCDA act 30 days period should be given. The encroachment should be cleared within the next 10 days. BBMP has submitted an action plan to the High Court that the eviction operation will be completed within 70 days.

Encroachment clearance of 10 lakes started

 BBMP has started the operation to clear encroachment of lakes and the Chief Engineer of Lakes Division has issued a notice to the concerned Executive Engineers to clear encroachment of 10 lakes.

 Bagmane Tech Park, Pinewood Villa, Grant Thanton, Cognizant Technology, LRDE encroached on Bairasandra Lower Lake. According to the BBMP report, the Kempabudhi Lake has been encroached by the Gangamma temple, and the survey work of all kinds of encroachment will now be done again.

 Alternative land for government encroachment!

 If any department of the government, including BDA, has encroached on the lake space, it should be vacated. If this is not possible, 'they should be given an alternative site or the value of the area should be given in cash,' saying that, BBMP has submitted an affidavit in the High Court, officials said.


 Detail of lake encroachment

  •  197 total lakes
  •  159 lakes have encroachment
  •  851 acres encrochment in lakes

 Yalahanka zone

  •  Veerasagar lake; survey should be done

 Mahadevpur Zone

  •  Bhattarahalli Lake; 6A, 3G
  •  Vengaiyanakere; 3A, 11G

 Rajarajeshwari Nagar zone

  •  Sandalwood Kaval Lake; 9.5 gunta

 Dasarahalli Zone

  •  Dasarahalli (Chokkasandra) Lake; 3A, 7G

 Bommanahalli Zone

  •  Mangammanapalya Lake; 21 Gu
  •  Puttenahalli Lake (Near Brigade Millennium); 3A, 19G

 Eastern Zone

  •  Bairasandra kelagina kere; 3A, 9.5g

 South Zone

  •  Nayandahalli Lake; There should be an encroachment survey
  •  Kempambudhi Lake; 11A, 17G

 Rajkaluve encroachment clearance process

  •  859.79 km total length of Rajakaluve
  •  655 streems 
  •  Encroachment in 768 cases

Cleared in 165 days: Prahlad

 Rajakaluve encroachment clearance under BBMP will be completed in 165 days. Within 10 days, the company's engineers should identify the encroachment and give a report. Then, a report is given to the Tehsildar. In 5 days it will be handed over to ADLR for survey. In 60 days all stress map will be created. Give it to Tahsildar, notice, sketch, description, final order process will take place in next 40 days. After that 30 days are allowed for appeal. The clearance operation will take place in the next 10 days. Everything will be preserved and handed over in 10 days,' said B.S. Prahlad said.

ಕನ್ನಡದಲ್ಲಿ ಓದಲು ಇಲ್ಲಿ ಕ್ಲಿಕ್ ಮಾಡಿ...



Friday, June 23, 2023

SWD Encroachment: There is 'NO STAY' to the prestigious; But, there is 'NO REMOVAL OPERATION' too

BBMP Mahadevapura Zone: Encroachment of dignitaries including Nalapad, Bagmane-Purvankara

SWD Encroachment: There is 'NO STAY' to the prestigious; But, there is 'NO REMOVAL OPERATION' too

Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್ 

Bengaluru: Even though the cases in the court are vacated, BBMP is counting on the eviction operation. Hence, the Encroachment of the Rajakaluve by the Prestigious buildings are still on.

In Mahadevapura area, which was tarnished as 'Bengaluru East drowned' due to heavy rains last year, famous ones like Nalapad, Bagmane-Purvankara, Rainbow Drive Layout have encroached on the Rajakaluve. Earlier when BBMP went to remove, they had brought a stay order from the court. Even though such a saty order has now been vacated, the BBMP officials are not taking action.

According to BBMP data, in 2016 there were 2,951 cases of encroachment of the Rajakaluve. The number has been cleared from time to time and now stands at 784. Excluding cases in court, areas encroached by BBMP, areas where canal route has been changed, there are now encroachments in 607 cases. Tehsildar has also ordered eviction in 119 places.

 Regarding the encroachment of the Nalapad Academy Embassy in Challaghatta, the case has been settled in court. Besides, the Tahsildar who conducted the survey issued a notice and issued an order for eviction, but the operation was not done. Similarly, the eviction order of RBD (Rainbow Drive) layout in Halanayakahalli, Junnasandra, Munnekolalu, Fern City in Doddanekkundi, Umiya businesses in Kadubisanahalli remains in the hands of BBMP officials. The staff was not instructed to conduct the operation.

 In more than a hundred such cases, the note has been written in the BBMP document that 'case disposed. Demolition to be taken up'. But this operation is not ready. In many cases there is an order from the Tahsildar for for eviction. Besides, the BBMP officials complain that the tehsildars are also following a policy of delay in issuing orders.

No person, even reputable institutions, should be allowed to encroach. I have instructed to clear everything," Deputy Chief Minister D.K. Shivakumar has said this many times in the last 20 days. But, in reality, such an operation is not happening. Citizens' allegation is that the encroachment of institutions owned or owned by eminent persons and politicians is not being cleared.

 784 Total Encroachment places

 118: Cases in court

 607: Pending clearance

 119: Cases ordered by Tahsildar


 All will be clear... Tushar girinath

Rajakaluve encroachment clearance operation is going on every day. No encroachment wii be left. One day when a big building is vacated, everyone will know. sometimes when the compound and shed are vacated, it is not a big news, BBMP Chief Commissioner Tushar Girinath said.

ಕನ್ನಡದಲ್ಲಿ ಓದಲು ಇಲ್ಲಿ ಕ್ಲಿಕ್ ಮಾಡಿ...




Monday, May 22, 2023

Capital Bengaluru not-equipped for crisis management

BBMP: Rajakaluve Encroachment not cleared since February; The silt has not been cleared and the concrete wall has not been constructed

Reconstructed, removal of  Rajakaluve encroachment on halt

Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್ 

BENGALURU: 45 minutes of rain has revealed that Bengaluru city is not yet ready to handle the woes caused by rain.

 The assurances given by the Chief Minister, Ministers, MLAs and BBMP Chief Commissioner Tushar Girinath as  when 'East Bengaluru was submerged' due to heavy rains have not been fulfilled.

 It was said that road drainage, cleaning of shoulder drains, removal of encroachment on Rajakaluve, removal of silt from canals and construction of concrete walls will be done in warfoot. However, the BBMP data itself says that since February till now, not a single operation to clear Rajakaluve has taken place. Further, water seeping into houses in other areas of the city, including Mahalakshmi Layout, shows that the ₹1,500 crore silt clearance and construction of concrete walls is still in progress.

 BBMP Chief Commissioner Tushar Girinath's promise that precautionary measures will be taken to prevent any hardship to the citizens during the rainy season in the city has turned out to be false. All the staff of the department, including the Chief Engineer of the Rajakaluve Division, were exempted from the election work. However, things did not work as expected.

 Rajakaluve encroachment remains at 784 places under BBMP. Last time there was a lot of damage due to heavy rain in Mahadevpur zone. Encroachment remains in 305 places in this zone. According to the latest statistics of BBMP, there are 124 encroachments in Dasarahalli zone, 86 in Bommanahalli, 79 in Yalahanka and 103 in East zone.

The state government has specially released about ₹1,750 crore for the reconstruction of the Rajakaluve. The Chief Engineer of the Rajakalive (SWD) Division is saying that the work costing ₹1,500 crore is going on to avoid problems in the rainy season where it is most necessary. However, Jagadish Reddy of Mahadevpur complains that it is not seen in reality.

Chief Commissioner Tushar Girinath says that the progress of Rajakaluve encroachment clearance and reconstruction project has not been reviewed due to election work.

 The construction of the sluice gates awaiting government approval

 Although the state government approved the plan to install 'sluice gate' for 148 lakes in the Amrita Urban Development Project last November, the permission to start the work has not yet been received.

 Government had agreed to spend ₹36.85 crore to construct 'sluice gates' for 102 lakes. The tender process was completed and sent for government approval. No consent has been received so far. Thus, even this time it will not be possible to reduce the rate of water flowing from the lakes.

The work of installing tubu in 10 lakes had already started. It is happening. However, after getting permission from the government for the installation of pipes in 102 lakes, an order will have to be issued," said Vijayakumar Haridas, Chief Engineer of the BBMP Lakes Department.

Rajakaluve encroachment statistics

  •  2,951: Total encroachment Case
  •  784:Total balance
  •  118:Cases in court

ಕನ್ನಡದಲ್ಲಿ ಓದಲು ಇಲ್ಲಿ ಕ್ಲಿಕ್ ಮಾಡಿ...



Wednesday, May 17, 2023

Rajakaluve Encroachment: more and more Found

Encroachment increased in BBMP's Mahadevapura zone; Difficulty again in the rainy season!

Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್‌

Bengaluru: Day by day, more and more cases of encroachment of the Rajakaluve are being discovered in the BBMP area, causing hardship to the people during the rainy season. As there is no sign of the encroachment clearance operation being completed before the rainy season, there is concern again.

Even though the BBMP claims that Rajakaluve encroachments are being vacated, there are still 784 encroachment cases pending for eviction. Not a single case of eviction has been conducted after February 21 this year. From January to February 21, encroachments were cleared in only 88 areas.

The chief commissioner of BBMP Tushar Girinath and the engineers of Rajkaluve Division said that the encroachment clearance operation will be completed before the rainy season. But according to the figures given by him, no eviction operation took place this year. As emergency works have to be carried out, the staff of the Royal Canal Department were also freed from election work.

'We are conducting an operation to clear Rajakaluve encroachment. While removing one, another is being discovered. Hence, the numbers are increasing again,' says Basavaraja Kabade, Chief Engineer of Rajkaluwe Division.

Engineers have given more emphasis to the work of constructing a barrier to the Rajakaluve than clearing the encroachment. About ₹1,500 crore is being spent for this. Engineers are not giving the details of where construction is being done and how much is being constructed.

Even the 'concrete' reconstruction work of the Rajakaluve will not be completed for another year. However, the rains in early May have revealed that the water in the canal is not flowing smoothly during the rainy season. Before the rainy season starts, the work to remove the obstructions in Rajakaluve has to be done in another month. There is no hope that the BBMP will function in such a warlike situation. Environmental expert Nagesh Aras expressed concern that the people are suffering.

20 places Rajakaluve route changed

Rajakaluve route itself has been replaced at 20 places in the western zone of BBMP. The BBMP data itself states that the original Rajakaluve flow has been changed and a new route has been made.


Creation of a new Rajakaluve?

There are no canals in the records of the revenue department. However, in some areas canals are required and need to be constructed. Therefore, wherever there is an imperative to construct a canal, there is a thought of seizing the land and giving TDR," said BBMP Commissioner Tushar Girinath.

There should be a buffer zone for the presence of royal canals. However, as of now there is no buffer zone around the creation or expansion of canals that the BBMP is going to create. This is because they are not in the revenue records. Thus, BBMP is creating a new canal in order to save the huge buildings. Environmentalists are alleging that TDR has been given to benefit the 'big people'.

Clearance not complete: Tushar Girinath

"Operation for encroachment clearance of Rajakaluve under BBMP is going on. Inspection and review of works has not been done recently. Will be done soon. It is true that during the encroachment eviction operation more cases of encroachment were also detected. Everything will be cleared," said BBMP Chief Commissioner Tushar Girinath.

Rajakaluve encroachment clearance is not yet complete. Barrier works are also going on for Rajakaluve. As of now, it will not be completed by the time of monsoon. He said that measures have been taken to ensure that rain water flows smoothly.

ಕನ್ನಡದಲ್ಲಿ ಓದಲು ಇಲ್ಲಿ ಕ್ಲಿಕ್‌ ಮಾಡಿ...



Monday, March 6, 2023

BBMP: Rajakaluve encroachment removal Overdue

Rajakaluve- No order from Tehsildar; Ready to vacate from March 10- BBMP

Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್‌

BENGALURU: The State government and BBMP are spending hundreds of crores of rupees to control situations like rain water control or floods. However, due to heavy rains, Rajakaluve has been postponing the clearance of  encroachment.

In 2022, the city saw the highest rainfall of 1,958 mm, and the Government and BBMP have announced some plans to deal with the situation without any problem. Re-designing of Rajakaluve, including box concrete and embankment of lakes are planned to control water flow. Not only this, the World Bank has also planned to prevent climate change at a cost of ₹ 3 thousand crore. But no one is talking about the relief of Rajakaluve  encroachment.

Due to the encroachment of the Rajakaluve, there was a flood-like situation in the city, the eastern areas were submerged. This was also accepted by the Government and BBMP. However, the encroachment clearance work has not started comprehensively even after six months.

The Rajakaluve under the jurisdiction of BBMP have been affected in 485 cases. BBMP Chief Commissioner Tushar Girinath had said in a meeting between the District Commissioner and the Tahsildar that February 15 is the last day for the Tahsildar to issue an order to vacate them. But even after this deadline, no order has come out. For a couple of days after such a meeting, a couple of places are cleared on a small scale. Then everything goes quiet.

Negligence of the authorities: 

'BBMP says that there is no Rajakaluve encroachment in the south zone of Bengaluru. But the authorities have hidden the encroachment there', complained Deepak, a resident of Jayanagar.

Rajarajeshwari Nagar is rich in Rajakalves in many ways. Gopal, a resident of Halagevaderahalli, alleged that despite sending pictures of the houses being constructed and complaining to the authorities including Basavaraja Kabade, Chief Engineer of the Rajakaluve Division, no action is being taken.

50% order pending:

In 50% cases where  encroachment  has been identified, an order is due from the Tahsildar. The delay was due to transfer of Tahsildars. However, it has been suggested to vacate all encroachments by March 15. The eviction notice is being issued by March 10,' said BBMP Chief Commissioner Tushar Girinath.

No removal if there is no problem: Tushar Girinath

In many cases of the city, BDA, BBMP, etc., there are many types of  encroachment on the public. In some cases, even though the original revenue record map of Rajakaluve are encroachment, there is no problem as there is an alternative canals. Evacuating hundreds of houses in those encroachments will do no good. Such cases will be brought to the notice of the High Court and will be proceeded with according to the order," said BBMP Chief Commissioner Tushar Girinath.

Zonal Commissioners have been instructed to identify encroachments within their jurisdiction. The Joint Commissioner has been ordered to inspect the site and give a report as to which encroachment removal is not beneficial. He said that there is no need to codify such zonal reports and clear any encroachments before the High Court.

Rajkaluve encroachment details

Zone;case

Mahadevpur; 146

Dasarahalli; 124

East; 88

Yalahanka; 79

RR City; 33

Bommanahalli; 8

East; 4

South (K.C. Valley); 3

Total; 485


ಕನ್ನಡದಲ್ಲಿ ಓದಲು ಇಲ್ಲಿ ಕ್ಲಿಕ್‌ ಮಾಡಿ..



Saturday, January 28, 2023

Rajakaluve encroachment clearance: Delay by Tehsildar

BBMP officials are waiting for orders in eight zones


Kere Manjunath ಕೆರೆ ಮಂಜುನಾಥ್

Bengaluru: BBMP Chief Commissioner Tushar Girinath informed that the Tahsildars did not give orders for the pressure relief operation of Rajakaluve.

The Tehsildar has been given a deadline of February 10 and 15 to issue a notice regarding Rajkaluve encroachment areas and give eviction orders. He said that as soon as the order comes, all the encroachments will be cleared.

 In case of encroachment in low-lying and sensitive areas where rain-flooding is to be prevented, surveyors should carry out survey work on priority. 

Tushar Girinath suggested in the review meeting held on Friday regarding Rajakaluve encroachment clearance operation that the Tahsildar should immediately issue an encroachment clearance order in such cases.

The concerned land surveyor should prepare the map without making any distinction between the land surveying discipline and the application of the village map and notes. The Tahsildar passed the order and directed the RPAD to get the acknowledgment through post as well.

Land Survey, Revenue and Land Records Department Commissioner Munish Moudgil, BBMP Special Commissioner Dr. Trilok Chandra, PN Ravindra, Reddy Shankara Babu, Dr. Harish Kumar, Preeti Gehlot, Deputy Commissioner Rahul Sharanappa Sankanur were present.

 Encroachment increase in Mahadevpur:

 Currently 130 survey numbers are occupied in Mahadevpur zone. Encroachments were identified in 159 new survey numbers. Tehsildar has issued encroachment eviction orders for 131 survey numbers. The authorities concerned directed to immediately clear the encroachments issued by the notice. The remaining 146 survey numbers encroachment orders should be issued by the concerned Tehsildar on priority basis. 62 cases are in High Court. West and R.R. Nagar zone  an additional one encroachment case each was identified. 

There is no removal in the RR Nagara, Dasarahalli

 BBMP RR Nagar and Dasarahalli zones There are 33 and 124 encroachment cases in respectively, and no eviction operation has been conducted since last November.

 BDA encroachment is legalised!

"BDA enroached Rajakaluve in 15 cases in East Zone. BDA has constructed a road in this encroachment area and there is no flooding here. Thus, the process of eviction of these encroachment cases will be abandoned," BBMP said in a report detailing Rajkaluve's encroachment.

 In the Koramangala Valley region of the South Zone, Rajakaluve has been encroached in three cases, and the area in these three cases has been given by BBMP on lease basis. So it is not cleared.

 The Zonal Commissioner of Yalahanka was instructed on December 13 to clear encroachment in 12 cases in Yalahanka zone. That work is still pending.

 Land grabbing has been done in 56 cases in Bengaluru South assembly constituency of Bommanahalli zone. No action on this. Another case is in court.


ಕನ್ನಡದಲ್ಲಿ ಓದಲು ಇಲ್ಲಿ ಕ್ಲಿಕ್ ಮಾಡಿ...

ರಾಜಕಾಲುವೆ ಒತ್ತುವರಿ ತೆರವು: ತಹಶೀಲ್ದಾರ್‌ರಿಂದ ವಿಳಂಬ